Ansoff, H. I. (1975). Managing strategic surprise by response to weak signals. California management review, 18(2), 21-33.
Bower, D. (2003). Management of procurement: Thomas Telford.
Choi, J. W. (2007). Forecasting potential project risks through leading indicators to project outcome. Texas A&M University.
Derakhshanalavijeh, R., & Teixeira, J. M. C. (2017). Cost overrun in construction projects in developing countries, Gas-Oil industry of Iran as a case study. Journal of Civil Engineering and Management, 23(1), 125-136.
Haji-Kazemi, S., & Andersen, B. (2013). Application of performance measurement as an early warning system: A case study in the oil and gas industry. International Journal of Managing Projects in Business, 6(4), 714-738.
Haji-Kazemi, S., & Andersen, B. (2014). Efficiency of project health checks (PHCs) as an early warning system in practice: A case study in Norway's telecommunication industry. International Journal of Managing Projects in Business, 7(4), 678-700.
Haji-kazemi, S., Andersen, B., Eleftheriadis, R., & Capellan, A. (2015). The Early Warning Procedure in an International Context. Procedia-Social and Behavioral Sciences, 194, 85-95.
Haji‐Kazemi, S., Andersen, B., & Krane, H. P. (2013). A review on possible approaches for detecting early warning signs in projects. Project Management Journal, 44(5), 55-69.
Kappelman, L. A., McKeeman, R., & Zhang, L. (2007). Early warning signs of it project failure: the dominant dozen. EDPACS, 35(1), 1-10.
Kaushik, N. (2013). Prediction of project performance: development of prediction model for predicting future performance of an OG&C project in EPC environment.
Keil, M., & Montealegre, R. (2000). Cutting your losses: Extricating your organization when a big project goes awry. Sloan management review, 41(3), 55.
Kerzner, H. (2013). Project management: a systems approach to planning, scheduling, and controlling: John Wiley & Sons.
Lewis, J. P. (1993). project manager's desk reference: Probus Pub. Co.
Lientz, B., & Rea, K. (2007). Project management for the 21st century: Routledge.
Love, P. E., & Smith, J. (2003). Benchmarking, benchaction, and benchlearning: rework mitigation in projects. Journal of Management in Engineering, 19(4), 147-159.
McKenna, M. G., Wilczynski, H., & VanderSchee, D. (2006). Capital project execution in the oil and gas industry. Booz Allen Hamilton, Houston.
Menches, C. L., & Hanna, A. S. (2006). Quantitative measurement of successful performance from the project manager’s perspective. Journal of Construction Engineering and Management, 132(12), 1284-1293.
Nikander, I. O. (2002). Early warnings: a phenomenon in project management: Helsinki university of technology.
Postali, F. A. S., & Picchetti, P. (2006). Irreversibilidade dos investimentos e valor da opção de encerrar a extração de petróleo.
Preis, A., Burcham, D., & Farrell, B. (2014). Spotlight on Oil and Gas Megaprojects: EY.
Rahman, M. M., & Kumaraswamy, M. M. (2004). Contracting relationship trends and transitions. Journal of Management in Engineering, 20(4), 147-161.
Salazar-Aramayo, J. L., Rodrigues-da-Silveira, R., Rodrigues-de-Almeida, M., & de Castro-Dantas, T. N. (2013). A conceptual model for project management of exploration and production in the oil and gas industry: The case of a Brazilian company. International Journal of Project Management, 31(4), 589-601.
Spjelkavik, I., Andersen, B., Onsøyen, L. E., Fagerhaug, T., & Marheim, H. (2008). Project performance management system: a conceptual framework for early warnings in projects. No-7465, Mei, 5.
Walley, P. (2013). Stakeholder management: the sociodynamic approach. International Journal of Managing Projects in Business, 6(3), 485-504.
Weijermars, R. (2009). Accelerating the three dimensions of E&P clockspeed–a novel strategy for optimizing utility in the oil & gas industry. Applied Energy, 86(10), 2222-2243.
Williams, T., Jonny Klakegg, O., Walker, D. H., Andersen, B., & Morten Magnussen, O. (2012). Identifying and acting on early warning signs in complex projects. Project Management Journal, 43(2), 37-53.
Williams, T., Klakegg, O., Andersen, B., Walker, D., Magnussen, O., & Onsoyen, L. (2010). Early warning signs in complex projects. Paper presented at the PMI Research and Education Conference.